SAPPI: Recovery Island External Works

Subtitle:

Job Summary

Layerworks

  • In situ compacted to a layer of 150mm.
  • A G7 gravel layer of 150mm.
  • A G5 gravel layer of 250mm.
  • A 200mm thick stabilised (G4 classification) layer compacted to 100%.

Concrete Works Steel Fixing

  • Reinforced concrete slab of 200mm constructed to tie up to existing concrete.
  • All works done to an area greater than 700 square meters.