SAPPI: Recovery Island External Works
Job Summary
Layerworks
- In situ compacted to a layer of 150mm.
- A G7 gravel layer of 150mm.
- A G5 gravel layer of 250mm.
- A 200mm thick stabilised (G4 classification) layer compacted to 100%.
Concrete Works Steel Fixing
- Reinforced concrete slab of 200mm constructed to tie up to existing concrete.
- All works done to an area greater than 700 square meters.