SAPPI BLOWER HOUSE

Big 5 Engineering was awarded and successfully completed the contract by Sappi for the Blower House on the following scope:

• Demolition of conveyors
• Demolition of chutes
• Demolition of structural platforms
• Fabrication and installation of gratings

SAPPI C4 SHUTDOWN

Big 5 Engineering was awarded and successfully completed the C4 shutdown for the following scope:

• Assembling and erection of structural platforms
• Rigging
• Mechanical installation
• Demolition of pipes and structural platforms
• Fabrication and installation of pipe supports
• Flange management
• Commissioning maintenance

Vulindlela Project: BROWN STOCK

Big 5 Engineering has been awarded the Brown Stock contract by Sappi on the following scope: Structural steel assembly and erection  Fabrication and installation of pipe supports  Mechanical installations Drilling/coring Flange Management Tank and Junk trap...

Proudly designed by Bunnypants Graphic & Web design studio | 2021
General Enquires:
+27 87 822 1174

Projects Director-Brian Chere
+27 81 266 5677
Operations Director-David Mokoena
+27 73 856 2713

Marketing Director-Lucky Nxumalo
+27 83 977 3762
Proudly designed by Bunnypants Graphic & Web design studio | 2021
General Enquires:
+27 87 822 1174

Projects Director-Brian Chere
+27 81 266 5677
Operations Director-David Mokoena
+27 73 856 2713

Marketing Director-Lucky Nxumalo
+27 83 977 3762